| Project Information |
Plant Owner: |
Jong Stit Energy Co Ltd |
| Plant Location: |
Bangkok, Thailand |
| Plant Type: |
Cogeneration Plant |
| Fuel Supply: |
Supply of woodchips from external source. |
| Plant Objective: |
To generate 7.0MW (gross) electricity output for client's factory's power consumption and power plant's parasitic load, as well as 30ton/hr of steam for process. |
|
| |
 |

| Power Requirements |
Power Plant's Internal Consumption :
Power For Domestic Use :
Power Required : |
800 kW
6,200 kW
7,000 kW |
|
Equipment
Woodchips fired boiler, steam turbine generator system, cooling water system, woodchips handling & feeding system, ash handling system, water treatment facilities, DCS control system, fire protection and detection system, compressed air system , steam and water circuit equipment etc., |
|
Power Plant design
- Fuel type: Woodchips
- Plant type: Cogeneration Plant
- Boiler: 1 unit of 55 tons/hr indoor woodchips fired steam boiler
- Steam turbine generator: 1 unit of 7MW extraction condensing steam turbine generator system
- Plant's operating conditions: 37 bara, 435 °C
- Gross electrical output: 7 MW
- Required steam extraction (to process): 30 tons/hr at 6 bara
|
|
|
|
|
|
|
|
| |
 |
|
 |
|
| |
|
|