JS Energy Co., Ltd
 
 
Project Information

Plant Owner:

Jong Stit Energy Co Ltd
Plant Location: Bangkok, Thailand
Plant Type: Cogeneration Plant
Fuel Supply: Supply of woodchips from external source.
Plant Objective:
To generate 7.0MW (gross) electricity output for client's factory's power consumption and power plant's parasitic load, as well as 30ton/hr of steam for process.
 

Power Requirements

Power Plant's Internal Consumption :
Power For Domestic Use :
Power Required :

   
   800 kW
6,200 kW
7,000 kW

 


Equipment

Woodchips fired boiler, steam turbine generator system, cooling water system, woodchips handling & feeding system, ash handling system, water treatment facilities, DCS control system, fire protection and detection system, compressed air system , steam and water circuit equipment etc.,


Power Plant design

- Fuel type: Woodchips
- Plant type: Cogeneration Plant
- Boiler: 1 unit of 55 tons/hr indoor woodchips fired steam boiler
- Steam turbine generator: 1 unit of 7MW extraction condensing steam turbine generator system
- Plant's operating conditions: 37 bara, 435 °C
- Gross electrical output: 7 MW
- Required steam extraction (to process): 30 tons/hr at 6 bara

 
 
 
 
 
 