Felda Palm Industries Sdn Bhd
 


Empty Fruit Bunch (EFB)



Project Information

Plant Owner:

Felda Palm Industries Sdn Bhd
Plant Location: Sabah, Malaysia
Plant Type: Cogeneration Plant
Fuel Supply:
Palm Oil Waste in the form of empty fruit bunch (EFB) is brought to the storage area where the EFB is fed into a specially designed shredder to shred it into fiber form before being fed into the service silo.
Plant Objective:
To generate 6.0 MW nett Electricity output using Palm Oil Waste (Empty Fruit Bunches) and simultaneously to supply steam at 14 barg for a flow volume of 16 metric tonnes per hour to refinery.
 


 
 
 
 

Equipment

EFB fired boiler, steam turbine generator, cooling water system, EFB shredding, handling and feeding system, ash handling system, water treatment facilities, DCS control system, fire protection and detection system, compressed air system , steam and water circuit equipment etc.,

 
 
Power Requirements    
Power Plant's Internal Consumption :
Sahabat Kernel Crushing Plant ( SKCP ) :
Sahabat Oil Product ( SOP ) :
Domestic :
Surplus (for future usage) :
Power Required :
1,500 kW
2,400 kW
1,800 kW
1,500 kW
   300 kW
7,500 kW
   
 
Power Plant Design
Fuel Type: Palm oil waste (Empty Fruit Bunches)
Plant Type: Cogeneration Plant
Boiler: 1 unit of 50 tons/hr indoor EFB fired steam boiler
Steam Turbine Generator:
1 unit of 7.5MW extraction condensing steam turbine generator system
Plant's Operating Conditions:   37 bara, 435 °C 
Gross Electrical Output:    7.5 MW
Required Steam Extraction (to process):
16 tons/hr at 14 barg

       
 
 
 

 

 