Parakaya Plywood Sdn Bhd
 


Partially-Completed Plant
Project Information

Plant Owner:

Parakaya Plywood Sdn Bhd
Plant Location: Sabah, Malaysia
Plant Type: Power Plant
Fuel Supply:
Woodwaste from factories
Plant Objective:
To generate 6.0 MW (gross) electricity output, using woodwaste, for domestic consumption

Equipment

Woodwaste fired boiler, steam turbine generator system, cooling water system, woodwaste feeding system, ash handling system, water treatment facilities, PLC control system, fire protection and detection system, compressed air system , steam and water circuit equipment, etc


Power Requirements:

Internal consumption :
Domestic Power Consumption :
Power Required :

   500 kW
5,500 kW
6,000 kW
   
Power Plant design
   
Fuel Type: Woodwaste
Plant Type: Power Plant
Boiler: 1 unit of 35 tons/hr indoor woodwaste fired
Gross Electrical Output: 6 MW
Plant's Operating Condition: 37 bara, 435 °C
Steam Turbine Generator: 1 unit of 6MW fully condensing steam turbine generator

Fuel Preparation (Chipper)
       
Assembled Boiler Deareator Turbine & Generator Control System
       
 
 
 
 
 