Partially-Completed Plant |
| Project Information |
Plant Owner: |
Parakaya Plywood Sdn Bhd |
| Plant Location: |
Sabah, Malaysia |
| Plant Type: |
Power Plant |
| Fuel Supply: |
Woodwaste from factories |
| Plant Objective: |
To generate 6.0 MW (gross) electricity output, using woodwaste, for domestic consumption |
|
Equipment
Woodwaste fired boiler, steam turbine generator system, cooling water system, woodwaste feeding system, ash handling system, water treatment facilities, PLC control system, fire protection and detection system, compressed air system , steam and water circuit equipment, etc |
|
| Power Requirements: |
Internal consumption :
Domestic Power Consumption :
Power Required : |
500 kW
5,500 kW
6,000 kW |
|
| |
|
|
| Power Plant design |
| |
|
| Fuel Type: |
Woodwaste |
| Plant Type: |
Power Plant |
| Boiler: |
1 unit of 35 tons/hr indoor woodwaste fired |
| Gross Electrical Output: |
6 MW |
| Plant's Operating Condition: |
37 bara, 435 °C |
| Steam Turbine Generator: |
1 unit of 6MW fully condensing steam turbine generator |
|

| Fuel Preparation
(Chipper) |
|
|
| |
|
|
|
 |
 |
 |
 |
| Assembled Boiler |
Deareator |
Turbine &
Generator |
Control System |
| |
|
|
|
|
|
|
|
|
 |
|
 |
|
| |
|
|